An undersized booster set leaves the top floors short of water. An oversized one costs more, uses more energy, and can over-pressurise the lower floors. Getting the size right comes down to two numbers, flow and head, and a few decisions about zoning and redundancy.

This guide sets out the method we use, with a simple worked example. Final sizing should always follow the plumbing code and authority requirements that apply to your project.

Step 1: Calculate peak flow

Peak flow is the highest demand the building is likely to place on the system at one time. It is lower than the sum of every outlet’s flow, because not all outlets are used together.

The usual method is:

  1. List every fixture: basins, WCs, showers, sinks, washing machines and so on.
  2. Assign each fixture a loading unit or fixture unit value from the design code used on the project.
  3. Add up the units for the area served by the booster set.
  4. Convert the total units to a design flow using the code’s probability curve or table.

Add any continuous demands separately, for example cooling tower make-up, irrigation or process water that runs at the same time as peak domestic use.

Step 2: Calculate total head

Total head is the pressure the pump must add. It is the sum of:

  • Static head: the vertical height from the lowest water level in the suction tank to the highest outlet served
  • Friction losses: losses in the pipework, fittings, valves, meters and any filters at peak flow, along the longest or most demanding route (the index circuit)
  • Residual pressure: the minimum pressure required at the index outlet, which depends on the fixture type and any appliances

If the pump draws from a tank above it, the height of water above the pump reduces the head required. If it draws from a tank below the pump, the suction lift adds to it.

Step 3: Check the maximum pressure

Pressure at the lowest outlets served will be higher than at the top. Most codes set a maximum static pressure at outlets. If the lower floors would exceed it, split the building into zones or fit pressure reducing valves on the lower floors.

In UAE towers, a common arrangement is a roof tank serving several floors below by gravity, a booster set for the top few floors, and further zones served from intermediate plant floors.

Step 4: Choose the number of pumps

  • Two pumps (duty/standby): each pump sized for 100% of peak flow. Simple and common.
  • Three pumps (duty/assist/standby): two pumps share peak flow, the third stands by. Gives better turndown at low demand, as one pump at 50% capacity serves most of the day.
  • Four or more pumps: for large buildings with very variable demand, or where the specification requires extra redundancy, such as hospitals.

Step 5: Choose the controls

Variable speed control with a VFD on each pump is the usual choice for multi-storey buildings. It holds constant pressure, reduces energy use at part load, and gives soft starts. Include:

  • A pressure transmitter on the discharge header
  • A pressure vessel sized for low flow periods
  • Dry-run protection in the suction tank
  • Run, fault and low level signals to the BMS

Worked example

A 20-storey residential tower has a roof tank. The top four floors are served by a booster set on the roof.

  • Fixture units for the four floors convert to a peak flow of about 4 l/s (14.4 m³/h).
  • The highest outlet is 4 m above the pump centreline. Suction is flooded from the roof tank, with the tank’s low water level 1 m above the pump.
  • Friction losses along the index circuit at 4 l/s are calculated at 8 m.
  • Required residual pressure at the index outlet is 1.5 bar, about 15 m.

Total head = 4 m static – 1 m positive suction + 8 m friction + 15 m residual = 26 m.

The selection is a duty/standby set of two vertical multistage pumps, each delivering 14.4 m³/h at 26 m, with VFDs, a pressure vessel and BMS signals. The lowest of the four boosted floors sits 9 m below the highest outlet, so its static pressure stays within limits without pressure reducing valves.

The numbers here are illustrative. Real projects need a full calculation of fixture units and friction losses.

Common sizing mistakes

  • Adding safety margins at every step, which oversizes the pump
  • Using pipe friction tables for new pipe only, with no allowance for ageing
  • Forgetting losses through meters, strainers and pressure reducing valves
  • Ignoring NPSH when the pump lifts from a tank below it
  • Selecting a pump whose duty point sits far from its best efficiency point

Frequently asked questions

What is the most important input for sizing a booster pump?

Both flow and head are essential. Flow is often overestimated, which leads to an oversized pump that runs inefficiently.

Should I add a safety margin?

A small margin on head for pipe ageing is reasonable. Large margins on both flow and head lead to oversizing. Variable speed control gives flexibility to adjust after commissioning.

Can Lifeline size the booster set for us?

Yes. Send drawings and fixture schedules and we will return a calculation and selection. See our hydraulic calculations service.

Next step

See our booster pump sets for the equipment, or contact Lifeline for a selection.